WD

This project was a full refurbishment inside and out and took 18 months to complete. We were responsible for all the FF&E, installed over 60 bespoke pieces including a beautiful herringbone wood floor, fireplaces from Italy and joinery in several of the rooms. We worked alongside several contractors to ensure that every detail was carefully considered and took the project from a concept to completion.

Location

London

Style

Classic Contemporary

Type

Residential

Colour

Multi-Coloured